Skip to main content

Hangar Operations.

Verified work across BO-105 / NBO-105, Eurocopter Dauphin AS365 N3+, rotor head rigging, and turboshaft engine assemblies.

Field-Proven Work.

Supporting PUSPENERBAD, POLISI UDARA, BASARNAS, and PUSPENERBAL fleets.

Showing 12 of 12 entries.

Indonesian Police BO-105 P-4019

BO-105 / NBO-105

P-4019 Apron Readiness

BO-105 hangar airframe restoration

BO-105 / NBO-105

Airframe Preservation

MBB BO-105 control rods

BO-105 / NBO-105

Flight Control Linkages

BO-105 component bench inspection

BO-105 Activity

Heat Exchanger Bench

BO-105 bay overhaul

BO-105 Activity

Periodical Inspection

BASARNAS Dauphin AS365 N3+ helicopters

AS365 N3+

BASARNAS SAR Fleet

Dauphin maintenance activity 1

AS365 N3+

Airframe Maintenance (01)

Dauphin maintenance activity 2

AS365 N3+

Powerplant Bay Check (02)

Dauphin maintenance activity 3

AS365 N3+

Fenestron Check (03)

Main rotor head hoist rigging

Rotor & Engine

Main Rotor Head Hoist

Turboshaft gearbox torque work

Rotor & Engine

Gearbox Torque Check

Hydraulic fluid reservoir

Rotor & Engine

Dual Hydraulic Unit

Project preview
Esc to close